Projekte-Referenzen-en

positerra

Ecosystem services project with positerra

Validation of the program for CO2 sequestration through humus formation   CO2-binding through humus formation by verico SCE, December, 2022 Verico SCE has completed the validation of the program for the CO2 Sequestration through humus formation – by the project sponsor and owner, positerra GmbH Rosenheim, based on the requirements of ISO 14064-2 “Specification with

Ecosystem services project with positerra Read More »

Improvement of quality management and verification of the German NIR

on behalf of the Federal Environment Agency The final report of the study: “Development of scientific-methodical bases for the implementation of the recommendations from the international inventory reviews -Improvement of the quality management and verification of the German emission inventories” represents one of the core projects of verico SCE. The objective of the project was

Improvement of quality management and verification of the German NIR Read More »

Europe-wide verification of F-Gas inventories

on behalf of SAMSUNG Electronics Air Conditioner Europe BV (SEACE) As importers of equipment (air conditioners, dryers), which are placed on the market pre-filled with F-gas refrigerants, the European subsidiaries of the SAMSUNG Group must report their imported quantities and stocks of F-gases annually in accordance with EU Regulation 517/2014 (F-gas Regulations) and must hold

Europe-wide verification of F-Gas inventories Read More »

MRV Türkei

Capacity Building for the MRV System in Turkey

on behalf of giz Gesellschaft für internationale Zusammenarbeit mbH To support GIZ in the implementation of the Accreditation and Verification Regulation (AVR) in the Turkish MRV system, verico SCE delivered more than 700 presentation slides on all aspects related to MRV, accreditation of verification bodies, and the necessary expertise. This input was applied in a

Capacity Building for the MRV System in Turkey Read More »

UER – Energy savings through a reed bed treatment plant in Oman

on behalf of Gulf Organisation for Research and Development (GORD) verico SCE performed a validation of a project plan (based on the CDM-PDD format) for the project “Energy savings through a reed bed wastewater treatment plant in Oman” to confirm the conformity of the project design with the requirements of ISO 14064 Part 2 and

UER – Energy savings through a reed bed treatment plant in Oman Read More »